Wesleyan Central Plant Green Roof Remediation
Located in Middletown, CT, the project removed the existing over-burden and waterproofing, with re-installation of approximately 19,000 sqft of new waterproofing, drainage composite, and over-burden with integrated leak detection system.
![weslyan-green.jpeg](https://images.squarespace-cdn.com/content/v1/64375ec9564e004b9f212477/1681365005677-WIGSXKZDR77DHXXCUYJY/weslyan-green.jpeg)